Computes observed follow-up from entry and exit dates, with an optional
administrative censoring date. If the original exit is after censor_at,
follow-up ends at the censoring date and the event indicator becomes zero.
An event on the censoring date is retained. A subject entering after the
censoring date is rejected rather than silently discarded; zero-day follow-up
is allowed. Each row is assumed to represent one distinct subject.
Usage
epi_follow_up(
.data,
entry,
exit,
event,
censor_at = NULL,
unit = c("days", "years")
)Arguments
- .data
An ungrouped data frame, one row per subject.
- entry, exit
Complete whole-day Date columns of entry and observed exit.
- event
Binary event indicator, 1 if the event occurred at the exit date and 0 if exit was already censoring.
- censor_at
Optional single whole-day Date for administrative censoring.
- unit
Either
"days"or"years"; years are calculated using 365.25 days.
Value
Input tibble with followup_end (Date), follow_up (numeric time in
selected units), and binary event_observed columns.
Details
This helper does not infer event dates from the record or handle recurrent
events, competing risks, delayed reporting, loss-to-follow-up mechanisms,
time-varying covariates or causal assumptions. A year is a fixed 365.25
days, not a calendar-year calculation. Censoring must be appropriately handled
in the downstream analysis.
Examples
d <- data.frame(
start = as.Date("2024-01-01") + c(0, 1),
end = as.Date("2024-01-01") + c(5, 10), event = c(1, 1)
)
epi_follow_up(d, start, end, event, censor_at = as.Date("2024-01-08"))
#> # A tibble: 2 × 6
#> start end event followup_end follow_up event_observed
#> <date> <date> <dbl> <date> <dbl> <dbl>
#> 1 2024-01-01 2024-01-06 1 2024-01-06 5 1
#> 2 2024-01-02 2024-01-11 1 2024-01-08 6 0